368棋牌官网客服

MENU

TAHOE RENO HYPERSCALE DATA CENTER ECOSYSTEMS AT UNPARALLELED LOW PRICING

The Citadel Campus located in Tahoe Reno, Nevada, will have a capacity of up to 17.4 million square feet of data center space and up to 850 MW of power upon completion, making it the world’s largest colocation data center campus. Switch’s Tier 5® Platinum facilities, combined with hyperscale purchasing power, makes Switch the highest-rated and most cost-effective colocation environment in the industry.

360双色球基本走势图

  • 4.9¢ per kWh, 100% green power
  • 100% power uptime guarantee
  • Up to 55kW per cabinet

617的彩大厅

  • 2% sales and use tax in Nevada
  • 75% reduction in personal property tax in Nevada
  • No personal state income tax in Nevada
  • U.S. approved ‘Qualified Opportunity Zone’

516棋牌唯一官方

  • 4.5ms to the Bay Area
  • Dedicated 7ms fiber to Switch’s Core Campus via the Switch SUPERLOOP®
  • 50+ carriers leveraged by Switch CONNECT® telecom auditing and purchasing cooperative
  • Services include: MPLS, IP, Transport, SIP and SD-WAN (Circuits do not have to terminate at Switch)
TAHOE RENO, NEVADA
The Citadel Campus
Sq. Ft. MW Status
TAHOE RENO 1 1,427,986 Sq. Ft. Up to 130
TAHOE RENO 2 532,938 Sq. Ft. Up to 60
TAHOE RENO 3 621,292 Sq. Ft. Up to 80
TAHOE RENO 4 937,200 Sq. Ft. Up to 80
TAHOE RENO 5 937,200 Sq. Ft. Up to 80
TAHOE RENO 6 937,200 Sq. Ft. Up to 80
TAHOE RENO 7 937,200 Sq. Ft. Up to 80
TAHOE RENO 8 621,292 Sq. Ft. Up to 60
TOTALS 6,952,308 Sq. Ft. Up to 650 MW Open Construction Planned
Switch TAHOE RENO

Switch

The World’s Leading Data Center Ecosystem Switch
Las Vegas Nevada 89118
2元中国福利彩票怎么看 2元中国福利彩票的买法 306官方彩票下载安装 2元买彩票选几个数字 2元就可以打1毛的炸金花棋牌 2元就可以打1毛的斗地主棋牌 2元彩票网专家杀号 2元彩票刮刮乐 2元彩票双色球走势图双色球 2元彩不错